
APF is a company specialized in the manufacturing of pool equipment, including liners, covers, roller shutters, and other accessories. It mainly serves a private customer base. The company operates five production sites across France, with a large part of its activity concentrated between Lyon and Valence.

The goal of the project was to replace APF's in-house production tracking tool. Over time, this toll had become less intuitive and unreliable, causing malfunctions that sometimes hindered the company's operations.
"Ipsum sit mattis nulla quam nulla. Gravida id gravida ac enim mauris id. Non pellentesque congue eget consectetur turpis. Sapien, dictum molestie sem tempor. Diam elit, orci, tincidunt aenean tempus." phrase de Louis à voir avec lui !!!
We first implemented several fixes to the existing tool to ensure it would remain operational for one more production season (from March to September). This temporary solution gave us the time needed to design and deploy a new, more suitable system tailored to APF's needs.
The new solution
The new system is built around three main components :
In summary, the project relies on three components: one managed by Cyberg (the Extranet) and two developed by our team.
Bluenet has already transformed the daily work of production teams. Thanks to smoother coordination across sites and reliable, transparent order tracking, time loss and oversights have been significantly reduced.
Factory managers now benefit from a clearer, real-time view of production progress. The tool also provides much finer traceability : each workstation is identified, allowing precise tracking of operations and performance.
Finally, Bluenet can be accessed from any device like computers, tablets, or smartphones and woks even on mobile networks (3G, 4G, 5G). This portability ensures continuous use, even in the event of internal network failures, allowing operators to access the application directly from the production floor.